Ross Brothers Farm
2004 Summer And Fall

While Excavating For The Cistern, Excess Fill Was Used To Make A Small Wildlife Pond.
Problems Started After The First Rain (About 1 Month After Completion).
The Back Side Of Dam Gave Way. Water Did Not Flow Over Dam But Soaked
Through and Washed It Out. Pond Would Not Hold Water.
A Plastic Liner Was Installed To Stop Leakage And A 4 Inch Tile Drain
 Was Added For Over Flow.